Material list review
Check drawing revisions, product specifications and quantities. Prepare the purchasing list and note any details that need clarification before ordering.
PROJECT PURCHASING & SHIPMENT
From the material list to export shipment, we review requirements, source materials and follow up suppliers. Each stage identifies the work, records and responsibilities for your order.
See the supply process
FROM LIST TO SHIPMENT
Structural design and on-site installation are not included in the material supply scope.
Check drawing revisions, product specifications and quantities. Prepare the purchasing list and note any details that need clarification before ordering.
Obtain supplier quotations against the list and check the main materials and matching parts together. Confirm the product specifications and items included in the quotation.
Pass the approved drawing revision and fabrication requirements to suppliers. Follow up the production schedule and report progress against the order.
Confirm who performs each required check and which records are needed. Collect supplier material and inspection records, identified against the order.
Arrange packing and protection by product, project area or shipment batch. Check package labels and quantities against the packing list.
Arrange cargo consolidation, loading and export shipment. Match the dispatch information and accompanying documents to each shipment batch.
QUALITY & TRACEABILITY
Before ordering, confirm the inspection scope, acceptance requirements, responsible parties and required records. Suppliers carry out the agreed production checks and provide their records; VANRELY follows up the checks and reviews the documents. Any customer-appointed inspection must be arranged as part of the order.
Link records through the agreed member and package references so receiving teams can check the shipment and retrieve documents later.
SURFACE PROTECTION
| Option | Requirements to confirm |
|---|---|
| Paint system | Surface preparation; compatible primer, intermediate coat and topcoat; dry film thickness per coat and in total; colour and touch-up requirements. Recoating intervals follow the product instructions. |
| Hot-dip galvanizing | Specified galvanizing requirements, coating thickness and inspection requirements. |
| Fire protection | The specified fire-protection system, performance requirements and compatible coating products. |
Touch-up materials, coating tools and inspection instruments can be supplied to order.
FABRICATION FOLLOW-UP
The order specifies which fabrication stages and checks apply. We follow up these stages with the supplier using the approved drawings and project requirements.

PACKING & DISPATCH
Check quantities, markings and required records against the order. Coordinate protection and labels for each product group, then align the packing list, dispatch batches and shipment documents.
Prepare your supply enquirySTART YOUR ENQUIRY
A short description is enough for a first enquiry. Share the details you already have, then we can clarify the rest.
Request a quotesales@vanrely.com